Control of installation height and material level of central feeding system

Source: DONGGUAN ORSTE MACHINERY EQUIPMENT CO., LTD Popularity:1053 Issuing time:2022/01/08 12:00:34 small middle Big

Control of installation height and material level of central feeding system

The central feeding system controls the material level in real time and adopts the method of weighing and metering. The installation height is required, and the reasonable control of material level is also the key.

The characteristics of quantitative feeding weight loss metering feeder determine that the feeding mode of mixing hopper is batch feeding. Therefore, each batch feeding of the mixing hopper will cause a large fluctuation of the material level. For the continuous and stable feeding of the system, it is necessary to implement reliable automatic control of the material level of the mixing hopper.

The normal loading state and abnormal loading state are converted according to the film breaking signal of the production line. The mixing hopper is set with high material level and low material level. When the material reaches the high material level, the total amount of material supplied to the mixing hopper decreases by 5%. Similarly, when the material reaches the low level, the total amount of material supplied to the mixing hopper increases by 5%. Keep the material level of the mixing hopper fluctuating in this range.

The installation height of feeding equipment is reduced and the maintenance is convenient. In the foreign scheme, most equipment such as weight loss metering feeder and mixing hopper are installed at a higher place (6 ~ 13m away from the ground). In the self-designed scheme, the weight loss metering feeder is only 2 ~ 3M away from the ground and the mixing hopper is not more than 5m. Therefore, the self-designed scheme is better, which is conducive to equipment maintenance. The reasonable scheme design not only meets the process requirements of the system, but also greatly reduces the engineering manufacturing cost and the operation cost of normal production.

In addition, the central feeding system is equipped with ultra-high and ultra-low material levels for alarm. It should be noted that the weight loss metering feeder should not change its setting parameters frequently and greatly, because after the parameters are changed, the feeder will automatically correct to a stable state, which requires a process, about 10 ~ 40s.


主站蜘蛛池模板: 台北市| 嘉义市| 张北县| 南川市| 宜兰县| 龙山县| 甘泉县| 仁布县| 得荣县| 青田县| 贡觉县| 佳木斯市| 正定县| 乌兰察布市| 英德市| 潍坊市| 共和县| 西吉县| 新竹市| 贵南县| 阿克苏市| 黄大仙区| 霍城县| 雅江县| 奉新县| 常熟市| 岢岚县| 五台县| 阿瓦提县| 景德镇市| 麟游县| 交城县| 合山市| 肥城市| 错那县| 岳阳市| 静海县| 新蔡县| 博兴县| 凤台县| 长宁区| 神池县| 定西市| 湘乡市| 新余市| 怀化市| 宣恩县| 同心县| 泗洪县| 沙田区| 鄂州市| 新巴尔虎右旗| 保靖县| 阿尔山市| 浪卡子县| 拉孜县| 崇文区| 建始县| 孟津县| 苍梧县| 汉中市| 大冶市| 石台县| 鄱阳县| 泰安市| 婺源县| 二连浩特市| 通化市| 阿瓦提县| 金山区| 甘孜县| 山阴县| 嘉禾县| 安泽县| 临朐县| 邹平县| 固始县| 阳原县| 东乌珠穆沁旗| 济阳县| 桓台县| 启东市|